S T A T U S : Completed 2011 B U D G E T: $ 600,000
Main Entrance Exterior
This
Project includes 40,000 square feet of Ceiling Replacement and lighting on Five
Floors with Minor wall and door demolition.
All sprinkler heads are being replaced to a recessed type to have a
fresh look to the ceilings. It also includes mechanical diffusers replacement.
The Challenges of this project are the complex coordination of the replacement.
The tenants of the building occupy all parts of the building, so all work will
need to proceed after hours. The facility is a high security building, which
involves an intense coordination effort and only allowing construction at
certain times. The fire suppression system will need to be drained each night
for construction on the sprinkler heads and brought back up for the next
working day.
P R O F E S S I O N A L S E R V I C E S I N C L U D E :
Theodore Levins Corridor Ceiling Renovation
- Drawings/
Specs for Demolition of existing
- Intensive Programming Phase with Client / Users
- Design Services for the Building
- Construction Documentation/Specifications for Building
- Construction Administration Services
- Intensive Programming Phase with Client / Users
- Design Services for the Building
- Construction Documentation/Specifications for Building
- Construction Administration Services